PROJECTS

January 3, 2019

409 – FISH PROCESSING FACTORY AT TRINCOMALEE INDUSTRIAL ZONE

An existing warehouse complex, located within the industrial zone has been re-designed to be converted as a fish processing facility. The challenge to the architect was […]
January 3, 2019

408 – WAREHOUSE AND FACILITY COMPLEX @ DAMBULLA

Client – KSP Evergreen Pvt Ltd Area – 75000Sqft Duration – 8 months
January 3, 2019

407 – PROPOSED FACTORY COMPLEX @ KOGGALA PROCESSING ZONE

Client – Flintec Quality Precision Pvt Ltd, Area – 20000 Sq Ft
January 3, 2019

406 – ADDITION AND ALTERATION FOR CCS LANKA @ KOCHCHIKADE

January 3, 2019

201-RESIDENCE AT HALOLUWA, KANDY

A renovation of an existing house to accommodate client’s requirements. The existing structure, which was also used for residential purposes did not provided the required spaciousness […]
December 31, 2018

200 – RESIDENCE AT SARANANDA ROAD, PERADENIYA

Sloping land was a considerable challenge for the architect. Overcoming the obstacles, the house was planned with the concept of split floor levels which connected through […]
December 31, 2018

405 – BISCUIT MANUFACTURING FACTORY COMPLEX @ MATALE

A comprehensive facility aimed for biscuit manufacturing. The primary concept was based on producing a more functional layout, which responds well to the overall flow of […]